Commit Graph
6 Commits
Author SHA1 Message Date
ZacharyZhang-NYandClaude Opus 5.5 d96967cfb9 Q79: reasoning, encrypted reasoning and signatures survive tool turns
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-08 13:24:59 -04:00
ZacharyZhang-NYandClaude Opus 5.5 f4d16eb46a Q17: budget every model request against the provider's context window
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-08 04:40:02 -04:00
ZacharyZhang-NYandClaude Opus 5.5 6570492daa Q3: record a structured handoff on every delegated task
create_task now pins upstream files by content hash and carries the
source task, source thread, verified facts, open questions and
acceptance criteria into the assignee's prompt.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-08 02:35:12 -04:00
ZacharyZhang-NY 4a7fac654e CEO can answer progress and rewrite goals from live data
Two c_suite tools in agent-goal-tools: company_status reports every goal
with real-work task counts (wake tasks and review checkpoints stay out),
work in flight, recent completions, and team headcount, so progress
answers come from the board instead of the model's memory; update_goal
rewrites an active goal's title/description when the founder redirects
the company, audited, CEO-or-owner gated. Both route through the sync
dispatcher; complete_goal now shares the same permission helper.
2026-07-14 00:13:08 -04:00
ZacharyZhang-NY 34ea33cb8d Goal completion is a claim, not a decision: the independent audit
Adopted from studying Claude Code's /goal (completion judged by a fresh
model, never the one doing the work) and pi-goal-x's auditor (isolated
session, read-only tools, explicit approval marker, rejects scaffold-only
and proxy-metric completions).

complete_goal no longer closes a goal on the caller's word:
- It now takes a required `evidence` claim, and permission/argument gates
  run before any audit spend.
- The audit is an isolated tool-turn loop: fresh conversation (the auditor
  never sees the executor's transcript), read-only workspace tools (no
  run_command), strict auditor instructions, at most 6 iterations.
- Only an explicit <approved/> closes the goal (recorded with the audit
  verdict). <disapproved/>, no marker, or an exhausted budget all leave the
  goal active and hand the decisive gap back to the caller as the tool
  result.
- The handler moved from the sync dispatcher into the run loop's async
  routing because it needs provider access; the goal-review prompt warns
  that substanceless claims will bounce.

AGENTS.md documents both this and the web-access contract.
2026-07-09 20:46:53 -04:00
ZacharyZhang-NY 26de3129b1 Goals end at achieved, not at an empty board: the goal-review loop
The board draining to 280/280 done left the company idle under a
still-active goal, with 24 markdown files and zero code as its life's work.
Two structural gaps caused it: goals had no lifecycle (status was written
once as 'active' and never read again — nothing re-engages anyone when the
last task closes), and nothing anywhere distinguished plans from product,
so every "engineering" objective closed on documents.

The loop, closed:
- tasks.origin (migration 055) records provenance: chat_wake for mention
  vehicles (backfilled from their runs), goal_review for checkpoints, null
  for real work. Chatter and checkpoints can therefore never count as
  progress.
- spawnGoalReviews (each worker tick): an active goal with zero open tasks
  and real progress since the last review gets ONE review task for the goal
  owner. The review demands evidence — list the workspace, read the code,
  run the tests; documents are how work starts, not proof it happened — and
  must end in exactly one of: complete_goal, or the next wave of tasks with
  requires_filesystem engineering. A review closed with neither spawns
  nothing: termination is structural, not a counter.
- complete_goal (CEO or goal owner) finally lets someone say a goal is
  achieved, audited.
- CEO and department-head voices now state the doctrine: a goal that
  promises software closes on code that builds and passes tests in the
  workspace, and implementation is delegated with requires_filesystem: true.

On the live profile this arms one review: the active platform goal has 0
open tasks and 21 real completed ones, so the CEO gets the checkpoint on
next launch and the company starts building instead of stopping.
2026-07-09 20:29:42 -04:00